STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
+4
Auma
Atong
hasbima@abe
utoh-Q8
8 posters
Page 2 of 3
Page 2 of 3 • 1, 2, 3
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
hjoreezhanna wrote:wah..utohq8 beraya di malaysia yer....
mesti hepi kannn
Hepi hepi ai jua... ading ipar ko patang raya 1 mamanjat bumbung marepel arial TV imbaham gadabuk jatuh... retak tengkorak...asa asap jua neh...
utoh-Q8- Mejar
- Posts : 1350
Points : 1359
Join date : 16/08/2009
Location : Q8-->Turkmenistan-->Saudi Arabia--->Cambodia--->Miri Sarawak
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
waw wrote:Esok hiden sampai K L kut.
16 hb jam 2 pm sampai KLIA...30hb jam 3 pagi bulik pulang...Qatar Airways
SELAMAT HARI RAYA NU KULAAN...HANYAR SAWAT MAMBUKA INTERNET...
utoh-Q8- Mejar
- Posts : 1350
Points : 1359
Join date : 16/08/2009
Location : Q8-->Turkmenistan-->Saudi Arabia--->Cambodia--->Miri Sarawak
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
salamat hari raya ka utuhQ8...barilaan haja
hasbima@abe- Leftenen Jeneral
- Posts : 15609
Points : 15721
Join date : 13/06/2009
Age : 62
Location : tamaloh
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Barilaan jua hagan Tuan Hasbima
utoh-Q8- Mejar
- Posts : 1350
Points : 1359
Join date : 16/08/2009
Location : Q8-->Turkmenistan-->Saudi Arabia--->Cambodia--->Miri Sarawak
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
lawas kada mandangar habar...wagas haja leh
hasbima@abe- Leftenen Jeneral
- Posts : 15609
Points : 15721
Join date : 13/06/2009
Age : 62
Location : tamaloh
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Salam nu Kulaan;
Selamat Hari Raya Maap Lahir Bathin;
Sekadar kongsi info saham "Hua An", saham murah ja RM0.50 sa unit.
Di bulan Mar'09 lalu, penasihat saham ko manyuruh "Buy" saham Hua-An. Dari March, harga saham Hua Ann sudah naik sebanyak 157%. Tetapi, jar penasihat saham mungkin akan naik lagi jar "rally further". Ujar nya lagi risiko untuk menurun adalah terhad (tahu am kenapa), harga Hua Ann stabil pada kadar RM0.50 se unit wahini. Ini adalah kerana sokongan kuat dari LTH's (Lembaga Tabung Haji) yang kini jar bahimat mangumpul akan Hua-An shares, jumlah saham LTH di Hua Ann wahini melebihi 5.5%.
Dari segi fundamentals, saham Hua Annthe di dagang akan parak awans inya NTA/share iaitu RM0.50 dan Hua Ann kada ada hutang atawa borrowings (nyaman nya awak kadida hutang).
The advisor advise a "TRADING BUY" on Hua-An to ride on any further upside potential. Sa unit 50 sen. Sa lot RM500, 10 lot RM5000. Amun naik saham tu kaena ka RM 1.00 sa unit alhamdullillah kawa ai duit paket RM5000 jar...
ini hanyalah sekadar ba kongsi info awat mahangati...info tadi di Petik dari Phillips Capitals Malaysia Sdn Bhd...
Barelaan...
utoh-Q8- Mejar
- Posts : 1350
Points : 1359
Join date : 16/08/2009
Location : Q8-->Turkmenistan-->Saudi Arabia--->Cambodia--->Miri Sarawak
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
adat berniaga
utung besar
untung kecil
rugi besar
rugi kecil
balik modal
bankrupt
utung besar
untung kecil
rugi besar
rugi kecil
balik modal
bankrupt
hasbima@abe- Leftenen Jeneral
- Posts : 15609
Points : 15721
Join date : 13/06/2009
Age : 62
Location : tamaloh
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Ulon mandoa akan agar kulaan kawa dapat untung balipat ganda... nyaman kaena banyak zakat nya...
Ameen...
Ameen...
utoh-Q8- Mejar
- Posts : 1350
Points : 1359
Join date : 16/08/2009
Location : Q8-->Turkmenistan-->Saudi Arabia--->Cambodia--->Miri Sarawak
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
mudah-mudahan di maqbolkan allah swt
hasbima@abe- Leftenen Jeneral
- Posts : 15609
Points : 15721
Join date : 13/06/2009
Age : 62
Location : tamaloh
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Jangan tersalah labur
Most aktif stock
Talam nilai tara RM 1
wayah ni tinggal 5 sen jua lagi sasaham
Most aktif stock
Talam nilai tara RM 1
wayah ni tinggal 5 sen jua lagi sasaham
Auma- Leftenan Kolonel
- Posts : 1713
Points : 1739
Join date : 25/05/2009
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Bkn tip hagan manukar
hagan baingat
Banyak syarikat China
Di dressing cukup2 utk 3 tahun
Cukup syarat masuk listing kat Bursa
Hagan tokehnya cash out banar ai
Imbah 3-5 tahun syarikat tu gin lingkup
hagan baingat
Banyak syarikat China
Di dressing cukup2 utk 3 tahun
Cukup syarat masuk listing kat Bursa
Hagan tokehnya cash out banar ai
Imbah 3-5 tahun syarikat tu gin lingkup
Auma- Leftenan Kolonel
- Posts : 1713
Points : 1739
Join date : 25/05/2009
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Ngaran- ngaran yang kada suah mangalihi investor stock market
( Past 25 years)
1.Tan Sri Dato' Lee Shin Cheng ( IOI Corporation Bhd n group of companies)
2. Tan Sri Quek Leng Chan ( Hong Leong Group )
3. Tan Sri Dato' Sri Dr. Teh Hong Piow (Public Bank)
Utoh Q8 adakah yang lain?
( Past 25 years)
1.Tan Sri Dato' Lee Shin Cheng ( IOI Corporation Bhd n group of companies)
2. Tan Sri Quek Leng Chan ( Hong Leong Group )
3. Tan Sri Dato' Sri Dr. Teh Hong Piow (Public Bank)
Utoh Q8 adakah yang lain?
Auma- Leftenan Kolonel
- Posts : 1713
Points : 1739
Join date : 25/05/2009
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Yang amat mengecewakan
1 Tan Sri Tajudin Ramli ( Celcom, Mas)
2. Tan Sri Wan Azmi (Land & General, Raileigh)
3. Tan Sri William Cheng ( Lion Grp, )
4. Tan Sri Dato’ (Dr.) Ir. Chan Ah Chye (Chairman of Talam Corporation )
Panjang list ni. Kalau boleh elak la group of co dari puak2 ni
1 Tan Sri Tajudin Ramli ( Celcom, Mas)
2. Tan Sri Wan Azmi (Land & General, Raileigh)
3. Tan Sri William Cheng ( Lion Grp, )
4. Tan Sri Dato’ (Dr.) Ir. Chan Ah Chye (Chairman of Talam Corporation )
Panjang list ni. Kalau boleh elak la group of co dari puak2 ni
Auma- Leftenan Kolonel
- Posts : 1713
Points : 1739
Join date : 25/05/2009
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Auma wrote:Ngaran- ngaran yang kada suah mangalihi investor stock market
( Past 25 years)
1.Tan Sri Dato' Lee Shin Cheng ( IOI Corporation Bhd n group of companies)
2. Tan Sri Quek Leng Chan ( Hong Leong Group )
3. Tan Sri Dato' Sri Dr. Teh Hong Piow (Public Bank)
Utoh Q8 adakah yang lain?
Ada yang ko ingat...aku suwah bagawe awan YTL....
4. Tan Sri Yeoh Tiong Lay...
utoh-Q8- Mejar
- Posts : 1350
Points : 1359
Join date : 16/08/2009
Location : Q8-->Turkmenistan-->Saudi Arabia--->Cambodia--->Miri Sarawak
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Kisah UEM di Qatar...wahine saham UEM di gantung di BSKL kada di niaga akan....
Firm accuses Ashghal of not clearing project dues
By Sarmad Qazi
A contractor to Public Works Authority (Ashghal) Salwa Road project has accused the authority of stopping payments to the tune of millions of riyals even after issuing the certificate of completion.
Malaysia-based UEM, the major contractor for the 81km project, work on which started in 2003, said it was in a precarious situation as non-payment of dues by Ashghal meant that it was unable to pay its own sub-contractors for months.
The four-lane (on each side) Salwa International Highway, which was completed in December, 2008, includes 15 intersections with facilities for emergency parking and service lanes.
“We were issued a certificate of completion of work by Ashghal in January 2009, after we completed the work in December 2008. Despite this, the authority has not released hundreds of millions of riyals to us in payments. Ashghal has in fact filed a court case,” an official said on condition of anonymity.
Ashghal filed a lawsuit seeking damages, reportedly about QR878.3mn, against design consulting engineer Parson International Ltd, UEM and Qatar Insurance Company over the project.
“UEM has been named the second defendant in the case, even though we simply carried out work as per the design. The legal recourse is essentially against the design consultant, yet our assets were frozen,” the official said.
According to sources close to the project, at least 55km (in separate stretches) of the southbound part of the highway developed rutting soon after work was finished in 2006, leading to friction between Ashghal and UEM.
The contractor maintained that there was a design discrepancy and it was just carrying out the design given to it by the design consultant.
“Basically you had a four-lane highway, where you wanted to keep the last two lanes with just some new coating. This caused damages and the folly in the idea was exposed,” the source said.
The damage only occurred to the lane 3 and lane 4 which was filled with rocks and covered by new asphalt, as opposed to the complete building of lane 1 and lane 2.
Ostensibly, fearing delays Ashghal renegotiated the remaining project, as well as fixing of the bad stretch with UEM who maintains it resumed work “in good faith and to move forward”.
“When the client calls you and tells you lets move forward from here after renegotiating, you continue work in good faith. But soon after you finish the project, you are told that you are being sued for the previous dispute. And that too a dispute not directly caused by us. That’s bizarre,” the source said.
Ashghal’s own March 2007 newsletter (Volume 6, page 3) article on the project notes: “The beautification works on the highway, which was started in 2001, turned out to be a failure – a matter that needed urgent interference. An international company responsible for designing the highway undertook the project. However, the designing was not properly reviewed by the concerned authority of that period. After winning tender, the Malaysian company started executing the contract in 2003. For the next nine months, the project did not record any considerable progress. During the rainfall last December, some gutters and pits appeared on all the three lanes of the road along 55km proceeding from Doha towards Abu Samra (the border).
“…the Ashghal committee report has clearly pointed out the faults and problems in the design of the project. The consultant has designed the project based on measurements beyond the standards and specifications of Qatar,” the article added.
Efforts to solicit a response from Ashghal were unsuccessful.
Barelaan...
Firm accuses Ashghal of not clearing project dues
By Sarmad Qazi
A contractor to Public Works Authority (Ashghal) Salwa Road project has accused the authority of stopping payments to the tune of millions of riyals even after issuing the certificate of completion.
Malaysia-based UEM, the major contractor for the 81km project, work on which started in 2003, said it was in a precarious situation as non-payment of dues by Ashghal meant that it was unable to pay its own sub-contractors for months.
The four-lane (on each side) Salwa International Highway, which was completed in December, 2008, includes 15 intersections with facilities for emergency parking and service lanes.
“We were issued a certificate of completion of work by Ashghal in January 2009, after we completed the work in December 2008. Despite this, the authority has not released hundreds of millions of riyals to us in payments. Ashghal has in fact filed a court case,” an official said on condition of anonymity.
Ashghal filed a lawsuit seeking damages, reportedly about QR878.3mn, against design consulting engineer Parson International Ltd, UEM and Qatar Insurance Company over the project.
“UEM has been named the second defendant in the case, even though we simply carried out work as per the design. The legal recourse is essentially against the design consultant, yet our assets were frozen,” the official said.
According to sources close to the project, at least 55km (in separate stretches) of the southbound part of the highway developed rutting soon after work was finished in 2006, leading to friction between Ashghal and UEM.
The contractor maintained that there was a design discrepancy and it was just carrying out the design given to it by the design consultant.
“Basically you had a four-lane highway, where you wanted to keep the last two lanes with just some new coating. This caused damages and the folly in the idea was exposed,” the source said.
The damage only occurred to the lane 3 and lane 4 which was filled with rocks and covered by new asphalt, as opposed to the complete building of lane 1 and lane 2.
Ostensibly, fearing delays Ashghal renegotiated the remaining project, as well as fixing of the bad stretch with UEM who maintains it resumed work “in good faith and to move forward”.
“When the client calls you and tells you lets move forward from here after renegotiating, you continue work in good faith. But soon after you finish the project, you are told that you are being sued for the previous dispute. And that too a dispute not directly caused by us. That’s bizarre,” the source said.
Ashghal’s own March 2007 newsletter (Volume 6, page 3) article on the project notes: “The beautification works on the highway, which was started in 2001, turned out to be a failure – a matter that needed urgent interference. An international company responsible for designing the highway undertook the project. However, the designing was not properly reviewed by the concerned authority of that period. After winning tender, the Malaysian company started executing the contract in 2003. For the next nine months, the project did not record any considerable progress. During the rainfall last December, some gutters and pits appeared on all the three lanes of the road along 55km proceeding from Doha towards Abu Samra (the border).
“…the Ashghal committee report has clearly pointed out the faults and problems in the design of the project. The consultant has designed the project based on measurements beyond the standards and specifications of Qatar,” the article added.
Efforts to solicit a response from Ashghal were unsuccessful.
Barelaan...
utoh-Q8- Mejar
- Posts : 1350
Points : 1359
Join date : 16/08/2009
Location : Q8-->Turkmenistan-->Saudi Arabia--->Cambodia--->Miri Sarawak
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Ni manunjukkan UEM kada maulah homework.
Maulah gawien kontrek di nagara saurang kada sama dgn nagara urang
"However, the designing was not properly reviewed by the concerned authority of that period. After winning tender, the Malaysian company started executing the contract in 2003. For the next nine months, the project did not record any considerable progress"
Hmmmmm...... balum tanto lulus dah badadas maulah. Bkn senang nak kautim mcm Msia.
Maulah gawien kontrek di nagara saurang kada sama dgn nagara urang
"However, the designing was not properly reviewed by the concerned authority of that period. After winning tender, the Malaysian company started executing the contract in 2003. For the next nine months, the project did not record any considerable progress"
Hmmmmm...... balum tanto lulus dah badadas maulah. Bkn senang nak kautim mcm Msia.
Auma- Leftenan Kolonel
- Posts : 1713
Points : 1739
Join date : 25/05/2009
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Salam Barataan;
Lawas jua kada manukar bali saham ni....
Ada jua kah carita nang bagus bagus....
Jar carita kisah TNB nang magun untung pada kalendar nang tuntung 31hb Aug 2009 banyak di surat habar Malaysia....
Kayapa lih saham TNB.... kawa jua lih di tukari tagak mahal banar wahine ......
ma-assalamah
Lawas jua kada manukar bali saham ni....
Ada jua kah carita nang bagus bagus....
Jar carita kisah TNB nang magun untung pada kalendar nang tuntung 31hb Aug 2009 banyak di surat habar Malaysia....
Kayapa lih saham TNB.... kawa jua lih di tukari tagak mahal banar wahine ......
ma-assalamah
utoh-Q8- Mejar
- Posts : 1350
Points : 1359
Join date : 16/08/2009
Location : Q8-->Turkmenistan-->Saudi Arabia--->Cambodia--->Miri Sarawak
Q
Auma wrote:Ni manunjukkan UEM kada maulah homework.
Maulah gawien kontrek di nagara saurang kada sama dgn nagara urang
"However, the designing was not properly reviewed by the concerned authority of that period. After winning tender, the Malaysian company started executing the contract in 2003. For the next nine months, the project did not record any considerable progress"
Hmmmmm...... balum tanto lulus dah badadas maulah. Bkn senang nak kautim mcm Msia.
UEM ni UMNO punya...
hasbima@abe- Leftenen Jeneral
- Posts : 15609
Points : 15721
Join date : 13/06/2009
Age : 62
Location : tamaloh
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
KLSE naik
Lityan Bhd
Syarikat ITC
2 hari
naik 100%
ANAK SYARIKAT TABUNG hAJI
Dah jadi GLC
Lityan Bhd
Syarikat ITC
2 hari
naik 100%
ANAK SYARIKAT TABUNG hAJI
Dah jadi GLC
Auma- Leftenan Kolonel
- Posts : 1713
Points : 1739
Join date : 25/05/2009
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
Ulun malabur dalam Forex... Jual beli Matawang...
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
cintaforex.com lih cucu imoh
utoh-Q8- Mejar
- Posts : 1350
Points : 1359
Join date : 16/08/2009
Location : Q8-->Turkmenistan-->Saudi Arabia--->Cambodia--->Miri Sarawak
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
umpat parking hajak!!!
kadak bisak maen saham
kadak bisak maen saham
Atong- Mejar Jeneral
- Posts : 8268
Points : 8310
Join date : 22/05/2009
Location : Alam Maya (Kuala Lumpur)
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
marketiva.com
tu counter apa....
tu counter apa....
hasbima@abe- Leftenen Jeneral
- Posts : 15609
Points : 15721
Join date : 13/06/2009
Age : 62
Location : tamaloh
Re: STOCKS DAN SHARES DI BURSA SAHAM KUALA LUMPUR MALAYSIA - HAGAN PEMINAT BATUTUKAR AWAN BAJUAL SAHAM
bukan counter kot
tapi market maker
broker le to!!!!
~Atong~maklumat dihujung jari
tapi market maker
broker le to!!!!
~Atong~maklumat dihujung jari
Atong- Mejar Jeneral
- Posts : 8268
Points : 8310
Join date : 22/05/2009
Location : Alam Maya (Kuala Lumpur)
Page 2 of 3 • 1, 2, 3
Similar topics
» menara Kuala Lumpur
» Selamat Hari di Baranakakan uma hagan Kak Ros awan Deengalimeng
» pasar malam bt5 kuala kurau
» akhbar BANJARMASINPOST@MALAYSIA
» Top 5 Gerakan Islam di Malaysia
» Selamat Hari di Baranakakan uma hagan Kak Ros awan Deengalimeng
» pasar malam bt5 kuala kurau
» akhbar BANJARMASINPOST@MALAYSIA
» Top 5 Gerakan Islam di Malaysia
Page 2 of 3
Permissions in this forum:
You cannot reply to topics in this forum